Main and implementation study

IPZ Uniprojekt MCF

Title: Implementation plan for 1st category landfill - Kaštijun
Investor:

Grad Pula (City government)

Year: 2007.
Total investment: 42.235.816 kunas
Project status: in implementation
Goal: Obtaining construction permit
Decription:

The work on sanitary landfill depends on number of factors . The preparation work is done based on technological project, the sanitary landfill is constructed and is worked on , while other technical details that are used to develop rest of technical documentation. The schedule of work is given in work instruction and waste disposal plan. We are emphasizing that after usage permit is obtained the water usage permit and certificate must be obtained. The employees need to take in consideration that all changes must be properly documented

The following sign must be on the entrance: WASTE LANDFILL - KAŠTIJUN, 1ST CATEGORY LANDFILL, JP "Herculanea" d.o.o. - PULA, hours of operation: MONDAY-FRIDAY 7-19 h. The landfill must be open 7 days a week, and closed on weekends. The operating hours are from 7 to 19 h in first and second shift, while the security guards are present in the third shift.

The landfill must be fenced with fence at least 2m high, and entrance will be possible only via access road through automatic gate. The guard directs vehicle at place of disposal. The exact place of disposal will be determined by landfill supervisor. The only vehicles allowed on site are municipal waste company vehicles, as well as other companies and private transport vehicles that have permission for disposing waste in this location. The residents can deliver waste up to 0,5 m3 volume. Other vehicles must obtained permission from landfill owner and they must give to security guard before entrance,
The guards on entrance 2 will perform the inspection of waste as well as on Entrance 1 and keep records on waste inspections. The records contain following data:
? vehicle data (tag no, type of vehicle, and usable volume)
? waste data: type (municipal, bulky, construction, green, technological), quantity (since there is no volume, usable volume of vehicle is used) and waste owner
? type of waste disposal, covering of waste and ensuring stability of disposed waste
? inspection of content and quantity of landfill gases,
? content of leachate water, content and quality of ground water, drainage of precipitation water and recultivating of part of landfill filled up with waste.
? emergency situations (fire, explosion, weather related problems)
? security guards (name and notes)

The integral part of the records are waste documentation (documents on technological waste), equipment used, used material, inspection and measures undertaken under environmental inspection personnel orders and overview of natural and emergency events on landfill

The responsible person for landfill is landfill supervisor. The dozer operator is also on the landfill and performs supervisor's duty if supervisor is absent.

The employees must be trained to operate landfill in safe manner and they must adhere to Workplace protection Law and Fire protection law. They should also be educated on landfill operation technology.

We also list the main characteristics of sanitary landfill: this is disposal system where waste is disposed under control on prepared ground, so harmful effects of uncontrolled disposal are avoided. After designed height of waste is achieved, the landfill will be closed and afterwards closely monitored
• the preparation of location includes::
a) excavation and transfer of waste disposed on ground around hole (carstic terrain) outside the planned work zone, with slope 1:2,5-1:3
b) return of waste on newly prepared surface with waste compacting and coveting of top layer of waste
c) construction of 3 wells on the deepest part of landfill and installation of pumps for recirculation of water collected in waste
• construction of road on location and access road
• construction of boundary channels for precipitation waters
• construction of degasification system (pipes+torch)
• continuation of operation and remediation of landfill. This will be achieved by placing inert material dike with waste slope 1:3 and covering of old waste with leveling layer
• disposal of waste with waste compacting
• covering of waste with water impermeable material (clay) or LDPE layer
• waste compacting to designed height
• placement of finishing layer on filled up parts of landfill (landfill closing)
• planting greenery
• monitoring

The waste goes through microbiological decomposition, so the organic fraction of waste will be demineralized. The process inside deposed waste cause waste settlement

 


go to the top

Main and implementation projects (last 3 years):

IPZ Uniprojekt MCF

Title: Conceptual design of waste landfill
Investor: Grad Beli Manastir (City Government)
Year: 2005.
Total investment: -
Project status: in process of implementation

go to the top

Title: Conceptual design of waste landfill
Investor: Grad Virovitica (City goverment)
Year: 2005.
Project status: in process of implementation

go to the top

Title: Main project of 1st category landfill
Implementation project of 1st category landfill
Investor: Grad Vukovar (City goverment)
Year: 2005.
Project status: in process of implementation

go to the top

Naziv: Main project of remediation
Investor: Grad Karlovac (City goverment)
Year: 2005.
37.540.700 kn
Project status: In process of development of project of change of main landfill

go to the top

Naziv: Implementation project of landfill for excavation material from construction of highway
Investor: Produkt
Year: 2005.
-
Project status: In process of implementation

go to the top

Naziv: Implementation project of remediation of central part of landfill- technological project
Investor: Zavod za izgradnju kantona Sarajevo - BiH (Canton goverment)
Year: 2005.
-
Project status: -

go to the top

Naziv: Main project of remediation of city landfill
Investor: Grad Beli Manastir (City goverment)
Year: 2005.
-
Project status: Obtained construction permit

go to the top

Naziv: Main project of remediation of city landfill
Investor: Grad Virovitica (City goverment)
Year: 2005.
24.818.494 kn
Project status: Obtained construction permit

go to the top

Naziv: Conceptual design of remediation of 1st category landfill "Božička"
Investor: Komunalno Jastrebarsko d.o.o. (Municipal waste company)
Year: 2005.
-
Project status: In process of implementation

go to the top

Naziv: Implementation project of landfill "Medvedov jarek"
Investor: Zelenjak d.o.o (Municipal waste company)
Year: 2005.
-
Project status: In process of implementation

go to the top

Naziv: Implementation project of landfill for exceed material from highway Zagreb – Varaždin construction
Investor: HAC (Croatian Motorway)
Year: 2004.
-
Project status: In process of implementation

go to the top

Naziv: Implementation project of landfill on "Tuk" location
Investor: Papuk d.o.o. (Municipal waste company)
Year: 2004.
-
Project status: In process of implementation

go to the top

Naziv: Implementation project of landfill "Johovača"
Investor: Komunalac d.o.o., Garešnica (Municipal waste company)
Year: 2004.
-
Project status: In process of obtaining construction permit

go to the top

Naziv: Implementation project of 1st category landfill – Gorjak
Investor: Krakom d.o.o., Krapina (Municipal waste company)
Year: 2005.
-
Project status: In process of implementation

go to the top

Naziv: Main project of remediation of landfill "Pržići"
Investor: VODOVOD I ČISTOĆA CRES MALI LOŠINJ d.o.o (Municipal waste company)
Year: 2005.
16.576.625 kn
Project status: In process of obtaining construction permit

go to the top

Naziv: Main project of remediation of landfill "Kalvarija"
Investor: VODOVOD I ČISTOĆA CRES MALI LOŠINJ d.o.o (Municipal waste company)
Year: 2005.
10.194.210 kn
Project status: In process of obtaining construction permit

go to the top

Naziv: Main project of 1st category landfill – Ivančino Brdo
Investor: Komunalno poduzeće d.o.o., Križevci (Municipal waste company)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of 1st category landfill Griža
Investor: Park d.o.o.,Buzet (Municipal waste company)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of 1st category landfill– Bikarac
Investor: Grad Šibenik (City goverment)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of 1st category landfill– Gorjak
Investor: Krakom d.o.o., Krapina (Municipal waste company)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of 1st category landfill– Cerik
Investor: Grad Daruvar (City goverment)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of 1st category landfill– Božička
Investor: Komunalno Jastrebarsko d.o.o. (Municipal waste company)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Technological project of continued waste disposal by using composting and crushing methods till the landfill closing- Duplja
Investor: GKTD Ivanj d.o.o Novi Vinodolski (Municipal waste company)
Year: 2004.
-
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of remediation and continued operation of 1st category landfill Lončarica Velika – Osijek
Investor: Grad Osijek (City goverment)
Year: 2004.
33.450.150 kn
Project status: Obtained construction permit. In process of implementation

go to the top

Naziv: Main project of remediation and continued operation of 1st category landfill Kaštijun – Pula
Investor: Grad Pula (City goverment)
Year: 2004.
20.000.000 kn
Project status: The main design project is currently being updated and expanded. Request for construction permit will be submitted

go to the top

IPZ Uniprojekt TERRA

Title: Implementation project of remediation of landfill "Peski"
Investor: Općina Kloštar Podravski (City Government)
Year: 2007.
Total investment: -
Project status: Obtained construction permit

go to the top

Title: Implementation project for landfill for excaved material from highway construction site Posedarje
Investor: HAC (Croatian Motorway)
Year: 2007.
Total investment: -
Project status: Obtained construction permit

go to the top

Title: Implementation project of landfill remediation of 1st category landfill „Podum
Investor: Grad Otočac (City Government)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Implementation project of landfill for excavation material from hydropower plant Lešće
Investor: HEP – HE Lešće (Croatian Power Company)
Year: 2007.
Total investment: -
Project status:  

go to the top

Title: Implementation project of landfill of 1st category landfill – D. Picudo
Investor: 6. Maj d.o.o Umag (Municipal waste company)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Implementation project of remediation of existing municipal waste landfill "Pržići"
Investor: VODOVOD I ČISTOĆA CRES MALI LOŠINJ d.o.o (Municipal waste company)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Main project of 1st category landfill
Investor: Grad Ivanec (City Government)
Year: 2007.
Total investment: 15.004.396 kn
Project status: In process of obtaining construction permit

go to the top

Title: Main and implementation project of 1st category landfill- Filipovica
Investor: Grad osijek (City Government)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Main project of 1st category landfill "Švajcerova ada"
Investor: Općina Darda (Municipal Government)
Year: 2007.
Total investment: -
Project status: Obtained construction permit

go to the top

Title: Main project of 1st category landfill – Dubravica
Investor: Općina Mljet (Municipal Government)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Main and implementation project of recycling yard- Leć
Investor: Josip Mateša, Brunac 50c, Vodice
Year: 2006.
Total investment: 55.055 kn
Project status: Obtained construction permit

go to the top

Title: Conceptual design of recycling yard
Investor: Grad Velika gorica (City Government)
Year: 2007.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Main project of landfill on "Tuk" location
Investor: Papuk d.o.o. (Municipal waste company)
Year: 2004.
Total investment: -
Project status: Obtained construction permit

go to the top

Title: Implementation project of 1st category landfill- Kalvarija
Investor: VODOVOD I ČISTOĆA CRES MALI LOŠINJ d.o.o (Municipal waste company)
Year: 2006.
Total investment: -
Project status: In process of obtaining construction permit

go to the top

Title: Update- Main project of 1st category landfill
Investor: Park d.o.o.,Buzet (Municipal waste company)
Year: 2006.
Total investment: -
Project status: Obtained construction permit

go to the top

 

EUREKA
LANDFILL “DOLINE” BJELOVAR
REFERENT PROJECTS:
 